
PROJECTNUMBERS
MWA Contractors – Avg.15 engineers across all disciplines
Length of Project – Estimated 2 years
Blocks – 1 Tower (But F1 is coming soon)
Installation – 494 Apartments
Levels – 54 Storeys
Height – 154 metre (505 ft) tall
Build Completed – Estimated Q3 2026

SYSTEMSINSTALLED
- Mains Cold Water Services (MCWS)
- Boosted Cold Water Services (BCWS)
- Domestic Hot Water Services (DHWS)
- Above Ground Drainage
- Gravity and Siphonic Rainwater Systems