MWA Contractors – Averaging 30 engineers across all disciplines
Length of Project – 48 months
Blocks – 4 Towers
Installation – 1508 Rooms
Height – Tower A is the second tallest building in the country standing at 67 storeys high. Tower B 54 storeys, Tower C 40 storeys and Tower D at 46 storeys.
Job Completed – June 2021

- Mains Cold Water Services (MCWS)
- Boosted Cold Water Services (BCWS)
- Domestic Hot Water Services (DHWS)
- Above Ground Drainage
- Gravity and Siphonic Rainwater Systems
- Rainwater attenuation

Deansgate Square features 92,000 sq ft of exceptional residential amenity across The Club, the roof garden, concierge and business gallery.
The development overlooks the River Medlock, and is surrounded by high-quality public realm with The Square, The Medlock Steps and The Garden.
The Square features a mixture of carefully curated local and independent restaurants, bars and shops, and has been designed to accommodate events to bring life to the area

Situated in the heart of the Great Jackson St regeneration area, stands our prestigious Owen St development. 1508 Luxury apartments across 4 iconic towers.
Tower A is the second tallest building in the country standing at 67 stories high.

mwa role
We were commissioned to design, supply and install the complete plumbing and mechanical services package to this development. Engaging with mechanical & public health specialist consultants to devise cost effective and efficient strategies across the above ground drainage and rainwater & Domestic water systems.

The Boosted cold water distribution system was quite unique on this scheme due to the high rise nature of the build. Working closely with our public health consultant we designed a system that could operate with working pressures in excess of 20 bar, whilst maintaining balanced operating pressures at each point of use. Each tower has its own domestic water plant room where high pressure booster sets are located. These booster sets pump the domestic water up and around each individual tower ensuring residents have a clean and fresh supply of drinking water at all times.
The above ground drainage system to high rise developments is often quite challenging. On this particular scheme, the drainage system used was the Terrain PAP & Pleura valve system. This particular system featured in a case study on Polypipe Terrains website.

Working closely with the Architects and the clients design team, MWA helped select a high-end specification for all traditional bathrooms, en-suite bathrooms, penthouse, and amenity areas.
The project start date for the plumbing and mechanical works was April 2019, delivering the job across a 48 month period, handing over to the client on time in June 21.