ONGOINGPROJECTS

Vita Group First Street

House of Social Block
Vita Group First Street - House of Social
MWA Leaf icon

PROJECTNUMBERS

^

MWA Contractors – Averaging 15 engineers across all disciplines

^

Length of Project – 20 months

^

Blocks – 1 Tower

^

Installation – 576 Bed Student Accommodation

^

Height – 14 Storeys (140ft)

^

Build Completed – Q2 2025

MWA Leaf icon

SYSTEMSINSTALLED

  • Mains Cold Water Services (MCWS)
  • Boosted Cold Water Services (BCWS)
  • ASHP generated Domestic hot water services (DHWS)
  • ASHP generated wet system heating (LTHW)
  • Above Ground Drainage
  • Gravity and Siphonic Rainwater Systems
MWA Leaf icon

THEDEVELOPMENT

The house of social will deliver 576 beds in a mix of four-to-six-bedroom clusters. There will be open planned kitchens and lounge areas as well as giving students access to a state of art gym.

It will also feature a 14,00sq ft food hall on the ground floor, this will be open to residents and the public. This features a central bar, and five independent kitchens brining forward some of the city new food concepts.

Vita Group First Street - House of Social
MWA Leaf icon

THEINSTRUCTION

mwa role

We were commissioned to design, supply and install the complete plumbing and mechanical services package to this development. Engaging with mechanical & public health specialist consultants, we devised cost effective and efficient design strategies in each discipline. We have allocated the correct levels of qualified engineers to ensure we can deliver this scheme to the highest standard and inline with the fast paced build program.

Working closely with the Architects and the clients design team, MWA helped select a high-end bathroom specification which works perfectly in this modern development.

Vita Group First Street - House of Social
MWA Leaf icon

KEYCONSIDERATIONS

This site is situated in a very busy part of Manchester city centre. There are numerous large scale developments being carried out in close proximity to this site, so this project is quite challenging logistically by means of material deliveries and also parking.

MWA Eco Systems logo
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.